FAQ’s
-
What types of businesses benefit most from solar and battery storage?
Commercial solar and BESS systems are ideal for:
Industrial facilities
Manufacturing plants
Warehouses & logistics operations
Cold storage
Retail centers & hospitality
Office buildings
Municipal & fleet operations
Any facility with high energy usage, peak-demand charges, or outage risk can benefit significantly.
-
How much can my business save with solar and battery storage?
Savings vary by facility, but most clients reduce:
Overall energy costs by 20–50%
Peak demand charges by 30–60%
Outage-related losses entirely
Pairing solar + BESS typically delivers the highest ROI and fastest payback.
-
Does California offer incentives for solar, battery storage, and EV charging?
Yes. California has some of the strongest programs in the country.
Eligible businesses can receive 35–50%+ in combined incentives for:Solar energy systems
Battery storage (BESS)
EV charging equipment (EVSE)
Demand reduction programs
Federal ITC + accelerated depreciation
Burge Energy handles all incentive guidance and applications.
-
What is a Battery Energy Storage System (BESS)?
A BESS is a commercial battery system that:
Stores energy for later use
Reduces on-peak utility consumption
Provides backup power (4–12+ hours)
Improves energy reliability
It works seamlessly with your existing utility power and/or solar.
-
How long can a battery system provide backup power?
Most commercial installations provide 4 to 12+ hours of backup capacity, depending on:
Facility size
Critical loads
Battery configuration
Solar integration
Systems can be engineered for longer durations if needed.
-
Can solar and battery systems operate during outages?
Yes, if designed with islanding/backup capability.
We specialize in systems that keep critical operations running even when the grid goes down. -
Do you install commercial EV charging stations?
Yes. We install:
Level 2 chargers
DC Fast Chargers (DCFC)
Fleet charging systems
Smart load management
Solar/battery-powered EV charging solutions
We also support software, billing, and reporting.
-
What is the typical installation timeline?
Most commercial projects follow this timeline:
Assessment & design: 1–3 weeks
Permitting & approvals: 2–8 weeks
Installation: 1–6 weeks depending on scope
Commissioning: 1–2 weeks
Total timelines vary based on project size, permitting, and utility coordination.
-
Do you handle engineering, permitting, and construction?
Yes. Burge Energy provides full turnkey EPC services, including:
Engineering
Procurement
Permitting
Utility interconnection
Construction
Installation
Testing & commissioning
We handle everything from start to finish.
-
How do I know what size system my business needs?
DescriptWe perform a comprehensive energy audit that analyzes:
Facility load profile
Utility bills
Peak demand usage
Roof and site suitability
Operational requirements
This allows us to design the most cost-effective, high-performance system for your facility.ion goes here
-
How long do solar panels and batteries last?
Commercial solar panels: 25–30+ years
Battery systems: 10–15+ years (with warranties)
We only use Tier-1, proven equipment from top manufacturers.
-
What areas does Burge Energy serve?
We serve commercial and industrial clients across:
Orange County
Los Angeles County
San Diego County
Riverside & San Bernardino (Inland Empire)
Southern California region
-
What makes Burge Energy different from other energy companies?
45+ years of construction excellence
Local Southern California expertise
Turnkey EPC contractor
Deep knowledge of CA incentives
High-quality engineering & craftsmanship
Reliable long-term partnerships
We don’t outsource we build.